MAMBRUI TOURIST TERMINAL WORKING DRAWINGS, FREDRICK FK

GENERAL
1.Drawings not to be scaled.Only figured dimensions to be used.
2.All dimensions shown are in mm unless stated otherwise.
3.P.V denotes permanent ventilation.
4.All sanitary fittings, doors, windows, lifts to schedules.
STRUCTURAL WORKS
1.Depth of foundations to be determined on site to S.E's
approval.
2.For R.C works refer to S.E details.
3.All adj. R.C works and masonry to be tied with strap iron at
alternative course.
4.All walls less than 150mm thk to be reinforced with loop iron
at every alternative course.
CIVIL WORKS
1.All slabs at ground level to be poured over 100 gauge
polythene sheeting on 50mm stone blinding on hardcore.
2.All soils under slabs to be treated to termite control.
3.All soils on cut embarkments to be stabilised.The slope
shouldn't exceed natural angle of repose.
MECHANICAL WORKS
1.All plumbing and drainage to comply with Lamu Town Council
specifications.
2.Drains passing beneath buildings and driveways to be encased
in 150mm thk concrete surround.
3.All underground foul and waste drain pipes to be class 41
golden brown pvc pipes.
4.Minimum slope on drain to be 1%.
5.All mechanical work to be coordinated with electrical and any
conflicts to be clarified before work begins.
ELECTRICAL
1.All conduits must be laid before plastering.

Documentation : 

Calendar

M T W T F S S
 
 
 
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 
30