4th year :Project - Learning Resource Centre by Mwende

CEILING
RETAINING WALL
AUDITORIUM
lECTURER'S
OFFICE
lECTURER'S
OFFICE
lECTURER'S
OFFICE
lIBRARY
lIBRARY
ROOF TERRACE
AUDITORIUM
LOBBY
FIRE ESCAPE
STAIRCASE
COURTYARD
GROUND FLR
FIRST FLOOR
SECOND
FLOOR
THIRD FLOOR
ROOF LEVEL
±0.000
+4.050
+8.100
+12.150
+16.200
COURTYARD OPEN TO
SKY
LIBRARY
LIBRARY
BALCONY LIBRARY
BALCONY
BALCONY
KITCHEN
GALLERY
MEETING ROOMS
STUDENT LOUNGE
STUDIO
STAIRCASE
STAIRCASE
STAIRCASE
GROUND FLR
FIRST FLOOR
SECOND
FLOOR
THIRD FLOOR
ROOF LEVEL
PROPTOTYPE LAB
1:20
200mm Thick wall
Floor finish to
approval
15mm sand cement
screed
100x25mm skirting
board
Damp proof course
150mm thick
concrete slab
well compacted
hardcore with
murram blinding.
200mm thick
foundation wall
600x200 concrete
strip footing.
N
SECTION-01
SCALE 1;100
SECTIONS

 

ELEVATIONS PDF

SITE PLAN PDF

PERSPECTIVES PDF

INTRODUCTION PDF

SECTIONS PDF

SITE PLAN PDF
 

Calendar

M T W T F S S
 
 
 
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 
30