4th Year Projcets : Interior Design of LRC by Ngigi

Natural ventilation, passive solar heating, high mass cooling with night
ventilation, high mass cooling, humidification and air conditioning are
necessitated.
3. Double banked rooms with temporary provision for diurnal air
movement
4. Heavy internal and external walls, floors and roofs for thermal shielding
5. Medium openings (20%-40% of the total walled area)
Use of sun shading elements; useful for critical facades
-Roof overhangs
-projection above windows
-projection within windows

 

battens
250mm diameter Halogen downlights
pvc laminated gypsum ceiling
Polyurethane rubber floor
finish

Polyurethane rubber floor
finish

 

Auditorium pdf

Elevations Pdf

Sections Pdf

 

Calendar

M T W T F S S
 
 
 
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 
30