REGIONALISM AND IDENTITY: CASE OF COUNTY ASSEMBLIES IN KENYA
The
project
proposal
is
in
line
with
the
2010
Constitution
of
Kenya
,
currently
in
force
,
which
replaced
the
1969
constitution
,
that
itself
had
replaced
the
1963
independence
constitution
.
In
terms
of
Government
Structure
,
one
of
the
key
changes
proposed
by
the
new
constitution
is
Devolution
-
Only
two
levels
of
Government
:
AttachmentSize
1- Project Introduction Summary.pdf4.64 MB
2- County Govns 1.pdf705.9 KB
3-County Govn.pdf364.96 KB
4- County Govn3.pdf447.69 KB
5- County Govn4.pdf640.39 KB
8- Site Justification.pdf13.63 MB
20- Site Analysis-Climatic.pdf695.11 KB
21- Site Analysis-Climatic.pdf1.3 MB
22- Brief Formulation.pdf587.94 KB
23- Detailed Brief.pdf251.87 KB
24- Case Study -Dacca1.pdf3.35 MB
25- Case Study -Dacca2.pdf6.74 MB
26- Case Study -Dacca3.pdf3.75 MB
27- Case Study -Chandigarh 1.pdf3.22 MB
28- Case Study -Chandigarh 2.pdf3.1 MB
29- Case Study -Chandigarh 3.pdf8.36 MB
30- Case Study -Wales 1.pdf7.66 MB
31- Case Study -Wales 2.pdf1.31 MB
32- Proposed Assembly -MoPW2.pdf4.77 MB
34- Concept Development-eLEMENTS OF SYMBOL.pdf4.23 MB
36- Concept Development-.pdf4.35 MB
37- Master Plan 1-1000.pdf snip.pdf4.92 MB
39- FirstFloor.pdf2 MB
39- FirstFloor.pdf snap.pdf2.48 MB
40- Second Floor.pdf1.68 MB
41-Elevation 1.pdf19.4 MB
42--Elevation 2.pdf16.78 MB
43--Elevation 3.pdf24.34 MB
44--Elevation 3.pdf20.45 MB
46-Section S-01.pdf1.55 MB
47-Section S-02.pdf1.8 MB
48-Section S-03.pdf647.21 KB
49-Section S-04.pdf496.85 KB
50- perspetive 1.pdf8.73 MB
51- perspetive 2.pdf7.98 MB
52- perspetive 3.pdf3.67 MB
53- perspetive 3.pdf10.36 MB
54- perspetive 3.pdf8.23 MB
55- perspetive 3.pdf8.52 MB
56- perspetive 3.pdf12.46 MB
ground plan.pdf4.51 MB
ground plan.pdf compressed.pdf1.89 MB
Project Pape Cover Page 1.pdf3.46 MB

Calendar

M T W T F S S
 
 
1
 
2
 
3
 
4
 
5
 
6
 
7
 
8
 
9
 
10
 
11
 
12
 
13
 
14
 
15
 
16
 
17
 
18
 
19
 
20
 
21
 
22
 
23
 
24
 
25
 
26
 
27
 
28
 
29
 
30